ENJOY 10% OFF YOUR FIRST ORDER
Free International Shipping
30-Day Satisfaction Guarantee

S-Curve Stone White Gold Hallway Console Table for Living Room

$851.95
$1,251.95
Shipping fees will be calculated at checkout.
Size
Color
Base Color
Quantity
  • Free Worldwide Shipping
  • Delivery 15–22 Days
  • Duties & Taxes Paid
  • 30-Day Returns
  • Secure Checkout
  • Free Worldwide Shipping
  • Delivery 15–22 Days
  • Duties & Taxes Paid
  • 30-Day Returns
  • Secure Checkout

Description

Description

The S-curve pedestal runs floor to ceiling in a single sculptural line — no crossbars, no lower shelf, just a slim 12-inch-deep surface that floats your keys and a table lamp without eating up hallway real estate. Stone top in gray, white, green, jadeite, or Pandora gold sits on a black or gold metal base. The narrow footprint works in tight entries where a standard console would block the flow.

Stone surface wipes clean and resists scratches from daily drop-offs. Available in four lengths — 31, 39, 47, or 59 inches — so you can match your wall span without custom ordering. The pedestal base stays stable without wall anchors, though you can secure it if you have kids or large dogs who lean.

Works as an entryway catch-all, a sofa-back display in open living rooms, or a narrow desk alternative in a bedroom corner. Keep out of direct sunlight to prevent fading on the metal finish. Wipe with a soft cloth; no special stone sealers needed.

Dimensions

Size31"L x 12"W x 31"H (78.7 x 30.5 x 78.7 cm)
39"L x 12"W x 31"H (99.1 x 30.5 x 78.7 cm)
47"L x 12"W x 31"H (119.4 x 30.5 x 78.7 cm)
59"L x 12"W x 31"H (149.9 x 30.5 x 78.7 cm)
StyleModern
Table Top ColorGray, White, Green, Pandora Gold/ Gray, Jadeite
Base ColorBlack, Gold
Table Top MaterialStone
Base MaterialMetal
Top ShapeRectangular
Table Base TypePedestal
Purposeful Distressing TypeNo Distressing
WidthNarrow (Under 12 in, )
HeightStandard (21-32 In, )
LengthSmall (Under 42 In, ), Standard (42 - 53 In, ), Long (53 - 75 In, )
Product TypeConsole Table
UsageBedroom, Living Room, Bar, Entry, Office
FeaturesWashable
Extendable / Collapsible TableNon-Extendable/ Non-Collapsible
UpholsteredNon-Upholstered

Features

Scratch ResistantScratch Resistant
Stain ResistantNot Stain Resistant
Storage IncludedStorage Not Included
Tray TopNot Tray Top
Wheels IncludedCasters Not Included
Leaf IncludedLeaf Not Included
Drawers IncludedDrawers Not Included
Shelves IncludedShelves Not Included
Cabinets IncludedCabinet Not Included

Assembly & Warranty

Product WarrantyProduct Warranty Included
Warranty Length1 Year
Full or Limited WarrantyLimited
Level of AssemblyPartial Assembly

Dimensions

Overall Length - Side to Side31.5" (80 cm), 39" (100 cm), 47" (120 cm), 59" (150 cm)
Overall Width - Front to Back12" (30 cm)
Overall Height - Top to Bottom31.5" (80 cm)
Mirror IncludedWithout Mirror
Seat IncludedSeat Not Included
Largest TableLargest Table Not Included
Middle TableMiddle Table Not Included
Smallest TableSmallest Table Not Included
Voltage
Shipping Info
Return Policy

Complete Your Living Room

Similar Items

Similar in This Style

You May Also Like

100% Satisfaction Guaranteed100 % satisfait ou remboursé100 % Zufriedenheitsgarantie
icon
FREE WORLDWIDE SHIPPINGLIVRAISON INTERNATIONALE GRATUITEKOSTENLOSER WELTWEITER VERSAND
icon
30-DAYS MONEY BACK GUARANTEEGARANTIE SATISFAIT OU REMBOURSÉ DE 30 JOURS30-TAGE-GELD-ZURÜCK-GARANTIE
icon
QUICK & EASY RETURNSRETOURS SIMPLES ET RAPIDESSCHNELLE & EINFACHE RÜCKGABE
icon
SAFE & SECURE CHECKOUTPAIEMENT 100 % SÉCURISÉSICHERER CHECKOUT

Recently viewed